Down to Earth Recycling Ltd - PAS109 Certification

Down to Earth Recycling Ltd (DTER) wished to achieve end of waste status for their plasterboard recycling…


Fernbrook Bio Ltd - Anaerobic Digestion Digestate Market Development (30,000t)

Fernbrook Bio Ltd, operate a 30,000 tonne per year AD taking food waste and cattle slurry. The site…


Lower Reule Bioenergy Ltd - Anaerobic Digestion Digestate Management and Market Development

Lower Reule Bioenergy Ltd - 30,000 tonne AD Facility Lower Ruele Bioenergy…


‹ First  < 3 4 5

Blog

Do you need a Fire Prevention Plan?

[07/07/2017] What is a Fire Prevention Plan (FPP)? FPPs are documents designed to address the risk of fire posed…

Case Study

Vital Earth - Occupational Dust Monitoring

Brief: …

Featured Post

Current Situation Surrounding Site Fire Prevention Plan Guidance

Since the Environment Agency released the new Fire Prevention Guidance Version 3 back in July 2016 there have been a number of changes made, which have added to the complexity of...