ReFood — Bespoke Permitting Support for AD Operation

Brief: WRM were commissioned by ReFood UK Ltd (ReFood) to aid in the completion of a bespoke permit application for a proposed biomethane to grid Anaerobic Digestion Plant. The Anaerobic Digestion plant, was to be situated at Desoto Road, Widnes, designed to process 120,000 tonnes of food waste and produce biomethane at a rate of approximately 1200m3hr.

Solution: To start the process WRM first established what components were required by ReFood in order to complete the bespoke permit.

After identifying the required documents WRM directly liaised with ReFood and the Environment Agency in order to gather the necessary information and complete the documents in a timely manner.

Permit Documents: The documents identified for the completion of the permit were as follows:

 

WRM worked hand in hand with the ReFood engineering team and operational manager to ensure that the correct technical information was presented, and operational requirements were maintained.

Outcome: The bespoke permit was successfully granted on 06/08/2014 meeting the client deadline to ensure commissioning ahead of schedule.

Testimonial: “WRM have excellent technical understanding of the permitting process and our requirements. We continue to work with WRM as a partner we can rely on to help our company grow and meet strategic objectives” Mark Baker, (Group AD Manager) ReFood UK Ltd.

Future Work: Following the successful granting of the permit for the Widnes site, WRM have been commissioned on multiple occasions to undertake further work for ReFood. Repeat projects have included supporting an expansion of the Widnes site and supporting the development of a new AD facility in Dagenham.

WRM have an unrivalled performance in service delivery with a 100% approval success rate. If you require permitting support and would like some expert assistance, please contact WRM using the details below.

Email: Thomas.Broderick@wrm-ltd.co.uk

Tel: 07891 929864

 

Related Case Studies:

Standard Rules Environmental Permit Support

Bespoke Environmental Permit Variation Support

 

 

 

Blog

Upcoming Changes to Bioaerosols Monitoring in 2017

[16/02/17] The Environment Agency has published a new Technical Guidance Note (M9) for the Environmental…

Case Study

Down to Earth Recycling Ltd - PAS109 Certification

Down to Earth Recycling Ltd (DTER) wished to achieve end of waste status for their plasterboard recycling operations. Gaining PAS109/QP certification was essential to reducing costs for recovery and…

Featured Post

The Waste and Resource Strategy - WRM is calling you

WRM welcomes the commitment made by central government for the mandatory collection of food waste from all household properties. This move will provide a welcome boost to the...