The regulatory landscape of waste management is evolving, and with the upcoming changes to waste exemptions expected in 2025, it’s crucial for businesses holding waste permits and exemptions to stay compliant.

Talk to Our Permit & Waste Exemption Compliance Experts

Understanding Waste Exemptions

Waste exemptions allow certain waste operations to be carried out without an environmental permit. However, each exemption comes with specific limits and conditions that must be adhered to. The UK government provides a comprehensive list of waste exemptions, categorised into four main types: using waste, disposing of waste, storing waste, and treating waste.

The 2025 Shift

In 2025, significant changes to waste management regulations are expected to take place. The Department for Environment, Food & Rural Affairs (Defra) has released a consultation supplementary response document detailing which exemptions will be withdrawn or restricted1. While the exact timescales have not been finalised, it’s clear that the waste management sector will undergo substantial modifications.

Key Changes to Anticipate

  • Withdrawal of Certain Exemptions: Some current exemptions may no longer be available, requiring operations to either cease or apply for a full environmental permit.
  • Restriction of Exemption Limits: The conditions and limits of certain exemptions may become more stringent, requiring additional infrastructure or reducing the scope of what can be done without a permit.
  • Removal of Exemptions on Permitted Sites: As part of the regulatory update, exemptions will no longer be allowed on sites, or next to sites, with an environmental permit. Should the currently exempt activities still be required by the operator, a variation to the environmental permit will be required to include these activities.

Transition Periods and the Importance of Timely Planning

As we approach the 2025 changes in waste exemptions, it’s important to note there will be a transition period for each type of exemption. These transition periods are designed to give waste exemption and permit holders adequate time to adjust to the new regulations. However, it’s crucial to be aware that some timeframes may be as short as three months.

Exemption Change Transition Period
U1 – Use of wastes to construct and maintain surfaces and barriers Changing conditions 12 months
U16 – Use of depolluted ELVs for parts Removal 3 months
T4 – Preparatory treatment of waste Changing conditions 6 months
T6 – Treatment of waste wood and plant matter Changing conditions 6 months
T8 – Mechanically treating end-of-life tyres Removal 3 months
T9 – Recovery of scrap metal Removal 3 months
T12 – Manual treatment Changing conditions 6 months
D7 – Burning of vegetation at the site of production Changing conditions 6 months
S1 – Temporary storage of waste in secure containers pending recovery elsewhere Changing conditions 12 months
S2 – Temporary Storage of waste at a secure site pending recovery elsewhere Changing conditions 12 months
Prohibiting the use of exemptions at/adjacent to permitted sites 6 months
Limiting the number of exemptions registered at a site 6 months
Compulsory requirement for operators to keep and make records available on request Immediately
Requirement for operators to keep records in an electronic format Immediately
Changes to waste codes Immediately

Why Early Planning is Essential:

  • Adapting Permits: If your operations require adjustments to include environmental permit variations or applications, the process may take longer than the transition period. Applications for permits, from inception meeting to approval, often take upwards of 12 months to complete.
  • Avoiding Non-Compliance: Late planning could lead to non-compliance, which might result in penalties or disruptions to your business operations.
  • Ensuring Continuity: Timely adaptation ensures that your waste management processes continue uninterrupted.

Next Steps

Familiarise yourself with the detailed changes and how they may impact your current exemptions.

Consult Experts

Seek advice from environmental consultants or legal experts specialising in waste management regulations.

Submit Applications Early

If you need to apply for new permits or modify existing ones, do so well before the transition period ends.

By starting your planning and preparation now, you can ensure your transition to the new waste exemption framework set for 2025 is seamless. If you are still unsure which changes impact your organisation, contact one of our permit and exemption experts today for a free introductory discussion. With a 100% approval rate for permit applications, we have long been a trusted choice in the environmental and waste permit landscape.